How to Finally Ship Your Side Projects: The Kill List Framework for Developers
Developer working on side project with planning notes and laptop, implementing the Kill List Framework for better project completion Productivity, Side Projects

Start With the End in Mind: The Developer's Guide to Shipping Side Projects

@nerajno
#productivity #side-projects #project-management #developer-workflow #motivation

23 min read

74 views

The Universal Developer’s Dilemma

Welcome, if you have found yourself here, you or a loved one is most like a technologist with too much unfinished side projects. Every developer knows this feeling intimately—that electric moment when a brilliant idea strikes, flooding your mind with possibilities for the perfect app, the clever tool, or the game-changing library that will finally showcase your skills. You create a new repository with enthusiasm, maybe even design a logo, and write some initial code with the fervor of a thousand suns burning in your chest. Six months later, it joins the graveyard of 47 other folders labeled “ProjectIdea_v1” through “ProjectIdea_v47” on your desktop, each one a monument to good intentions and poor execution. If this sounds painfully familiar, you’re not alone—research shows the average developer maintains 3.7 unfinished side projects at any given time, with completion rates hovering at a dismal 15-20%. The truth that took me years to accept is harsh but liberating: the problem isn’t your lack of time, motivation, or even skill—it’s that you’ve never learned to negotiate with yourself about what “done” actually means.

Note to self: This is as much a reminder for me as it is advice for you. Check out my current side project—it’s a work in progress, just like everything else. Should be done MVP by end of Dec 2025.

Starting with the End: Why Definition Matters More Than Motivation

Planning and defining project scope with clear objectives Define your destination before you start the journey

The difference between developers who ship and those who eternally tinker lies not in their technical abilities or available time, but in their ability to define completion before writing a single line of code. Most of us approach side projects like we’re either building for a Fortune 500 company or wanna play with some new library or framework, architecting for millions of users who will never come, optimizing for scale we’ll never need, and adding features for edge cases that exist only in our imagination … you get the picture … too much. There is no such thing as strategic planning when it comes to some of our side projects — we wrap them in perfectionism wearing the disguise of professionalism and too much experimentation, and these are the silent killers of more projects than all technical debt combined. Before touching your keyboard, I have a suggestion for you: you must create what I call a “Done Contract” with yourself, explicitly stating what features constitute a shippable version beta and, more importantly, what features absolutely do not. This contract becomes your North Star when scope creep whispers sweet nothings about “just one more feature” at 2 AM, providing the clarity and boundaries that transform endless projects into shipped products.

The Kill List Framework: Applied Violence for Project Survival

Ruthless prioritization and cutting unnecessary features Ruthlessly cut features to protect your project’s survival

The Kill List Framework isn’t just another prioritization exercise—it’s a structured approach to murdering your darling ideas before they murder your project’s chances of completion. Start with a 15-minute brain dump where you write down every feature you’ve imagined for your project, including the realistic, the ambitious, and the absolutely absurd—this is your “everything list” that represents your unconstrained vision. Next comes the brutal categorization that separates dreamers from shippers:

  • MUST-HAVE features (maximum 3) that represent the absolute core without which your project has no reason to exist.
  • SHOULD-HAVE features (maximum 5) that enhance the experience but aren’t required for launch.
  • COULD-HAVE features that sound great but will delay your launch by months.
  • WON’T-HAVE features that you explicitly reject and document to prevent their resurrection.

For example, when I built rebuilt isNerandodoneyet, my original feature list included real-time collaboration, AI-powered suggestions, mobile apps, plugin systems, themes, and team workspaces—but my Kill List reduced this to just three must-haves: create and edit markdown files, preview rendered markdown, and save files locally. Every Saturday at 3 PM, I performed a 15-minute Kill List audit, checking if any features tried to sneak back in, whether I added scope that wasn’t on the MUST-HAVE list, and updating the “Last Updated” date to create accountability with myself.

The 48-Hour Recovery Protocol: Momentum Physics for Developers

Overcoming project inertia and maintaining momentum Break the inertia before it becomes permanent

When you stop working on a project, inertia takes over with the force of a black hole, and after 48 hours, the psychological barrier to restart increases exponentially—this isn’t about guilt, it’s about understanding the physics of momentum in creative work. Within two hours of realizing you’ve stalled, acknowledge it immediately without waiting for your next scheduled work session, and write down exactly why you stopped: was it technical blockers, scope confusion, burnout, distraction, or the siren call of perfectionism? Within 24 hours, identify and complete the smallest possible productive action—fixing one typo in documentation, writing one test, committing work-in-progress code as-is, updating your README with current progress, or even just deleting one unused file—because the goal is breaking inertia, not making progress. Within 48 hours, take decisive action: if you broke scope, revert to your last “known good” state; if blocked technically, time-box research to one hour then choose the “good enough” solution; if burned out, explicitly schedule your next 20-minute work session; if distracted by a shiny new idea, close all tabs and document it in an “Ideas Parking Lot” file for review in three months. This protocol has saved dozens of my projects from the special kind of death that comes from “I’ll get back to it tomorrow” syndrome.

Time-Boxing: The 30-Day Sprint to Reality

Calendar and sprint planning with strict deadlines 30 days to ship: deadlines are sacred, features are negotiable

Time constraints breed creativity and prevent gold-plating, which is why I’ve adopted a strict 30-day sprint structure that forces completion decisions rather than endless deliberation.

  • Week 1 focuses on setup and your first core feature: days 1-2 for project setup and architecture decisions, days 3-7 for building MUST-HAVE feature #1 completely without any polish or optimization.
  • Week 2 tackles the remaining core features with similar intensity: days 8-11 for MUST-HAVE feature #2, days 12-14 for MUST-HAVE feature #3, with no deviations or “quick additions” allowed. - Week 3 brings everything together: days 15-17 for connecting all features and fixing only integration bugs, days 18-21 for minimal UI polish and basic error handling that prevents crashes but doesn’t handle every edge case.
  • Week 4 is your launch sequence: days 22-25 for writing documentation and testing with one real user who isn’t you, days 26-28 for deployment and fixing only critical bugs, day 29 for soft launch to friends or community, and day 30 for public announcement regardless of your comfort level with the current state.

If you slip behind schedule, you cut the most recent feature, not the deadline—the launch date is sacred while features remain negotiable, because a shipped imperfect project beats a perfect project that exists only in your head.

The Psychology of Progress: Why Small Celebrations Matter

Celebrating small wins and milestones in development Celebrate every win, no matter how small

So projects with clearly defined milestones and celebration rituals are 4x more likely to reach completion because our brains are wired for immediate gratification, while side projects by nature delay gratification for weeks or months—you need to hack this biological system. By maintaining a “Done Diary” where one logs every coding session’s accomplishments no matter how small: “Fixed the CSS bug” counts, “Refactored the authentication flow” counts, and even “Spent 30 minutes and made everything worse” counts because showing up is half the battle. For public accountability ( I don’t like it either) ,sharing progress openly even when it’s embarrassing, posting screenshots of half-broken UI on Twitter with #buildinpublic, writing weekly Dev.to posts about challenges faced, and joining Discord communities where other builders share their struggles and wins. My milestone reward system is different from others. I don’t like the idea of rewards, but I do like the idea of celebrating progress, I like making ice cream and going for boba in the middle of the city. These aren’t frivolous expenses or time-wasters—they’re psychological anchors that train the brain to associate project progress with positive outcomes, creating a dopamine feedback loop that pulls you through the brutal middle phase where most projects die. Hacking is always important.

Energy Management: Your Secret Weapon Against Abandonment

Managing energy levels for optimal productivity Energy, not time, is your most valuable resource

Your energy, not time, is the limiting resource in side project completion, yet most developers completely ignore this reality when scheduling their work sessions. I spent a week tracking my energy levels at different times (5-11 AM, 2-4 PM, 7-10 PM) and discovered my peak hours were completely different from when I had been trying to code, which explained why every session felt like pushing a boulder uphill. High-energy tasks like architectural decisions, complex algorithm implementation, learning new technology, and debugging gnarly bugs now get scheduled during peak hours only, while medium-energy tasks like implementing planned features, writing tests, and refactoring fill the normal hours. Low-energy periods aren’t wasted—they’re perfect for code formatting, updating dependencies, organizing files, reading documentation, and planning the next session’s work, tasks that still move the project forward without requiring deep focus. Identifying and eliminated energy drains such as : decision fatigue (make all tool/stack decisions in week one), context switching (Slack and email are completely off during work sessions), perfectionism (when the timer goes off, I commit the code as-is), comparison (unfollowed all those 10x developers on Twitter), and negative self-talk (I keep a “Past Wins” document that I read when imposter syndrome strikes). This energy-aware approach has tripled my effective productivity without adding a single hour to my schedule.

The Boring Tech Principle ~ !Learning: Choose Stability Over Novelty

Stable, proven technology stack over bleeding edge tools Boring tech ships; shiny tech delays

Use the most boring, proven technology that solves your problem, because your side project is not the place to learn Rust, WebAssembly, and a new database simultaneously while also building something you want to ship ( unless you’re building a learning project or a hackathon). This isn’t about avoiding growth—it’s about being intentional with your learning. When your goal is to ship a product, every new technology you introduce multiplies complexity and delays delivery.

I explicitly avoid bleeding-edge frameworks that might break next month, custom build tools that require configuration gymnastics, microservices when a monolith would work perfectly, complex state management when useState is sufficient, and especially rolling my own authentication when Auth0, Clerk, Firebase or Supabase exists. There’s a time and place for learning new technologies—dedicated learning projects, hackathons, or that experimental branch you maintain specifically for exploration. But when you’re trying to ship something real, mixing learning goals with shipping goals usually means achieving neither. The industry will always have new frameworks to learn; your side project won’t always have momentum to maintain both learning and shipping.

The “Boring Tech Test” is simple but effective: if you abandon this project for three months, can you return and immediately understand what’s happening without reading documentation or remembering complex setup? If the answer is no, you’re using too much novel technology. Every moment spent debugging that experimental GraphQL federation setup or figuring out why your cutting-edge bundler broke after an update is a moment not spent shipping your actual project. Save the learning projects for when learning is the explicit goal, not when shipping is what matters. You can always rebuild it with the shiny stack after you’ve validated that people actually want what you’re building.

The Two-File Start: Defeating Analysis Paralysis

Minimal project setup with just essential files Start with two files, not twenty folders

Overcome blank-canvas paralysis by starting with just two files instead of spending days on perfect project structure that you’ll inevitably reorganize anyway. There are different suggestions for various types of projects, but the general idea is to start with a written plan and then implement it. There are various schools of thought on project structuring and planning, here is an example of that tends to speak to me. With this in mind, here are a few suggestions:

  • For web apps, create only index.html for basic structure and app.js for core logic—no folders, no components, no “proper” architecture until you have something working on screen.
  • For APIs, start with server.js for your Express or Flask server and routes.js for one endpoint that returns hardcoded data—you can add middleware, error handling, and proper structure after you’ve proven the concept works.
  • For CLI tools, begin with just main.py or index.js as your entry point and README.md with one usage example—no argument parsing libraries, no configuration files, no plugin architecture until someone actually uses the tool.

With the advent of AI prompting and code generation, it is important to resist creating folders, configuration files, or “proper structure” until you have working code that does something useful, because structure should emerge from actual needs rather than anticipated ones, and every moment spent on hypothetical organization is a moment stolen from building real functionality. This approach has consistently gotten me from idea to working prototype in under two hours/days or weeks while my previous approach of “setting everything up properly” often took days before I wrote any actual feature code.

The Collaboration Paradox: Why Your First Project Should Be Solo

Solo developer working independently on project Ship solo first, collaborate later

Here’s a controversial take: for your first few side projects, work completely alone, no matter how tempting collaboration seems … yes its ok to ask for help or advice, but coding along with you. Working solo eliminates coordination overhead, conflicting visions about features or implementation, waiting on others to review PRs or complete their parts, and the social awkwardness of having different commitment levels when a party loses interest. You maintain full creative control, make decisions instantly without discussion, pivot without consulting anyone, and most importantly, own both the success and failure completely without excuses or blame. Consider collaboration only after you’ve successfully shipped 1-2 solo projects and understand your own working style, when you genuinely need complementary skills like design when you’re a backend developer, when someone else is equally committed with skin in the game, or when the project scope truly requires multiple people which is surprisingly rare for side projects. Rule of thumb: More cooks = more problems. If you do collaborate, keep it to a maximum of three people, ensure equal commitment levels through explicit discussion, hold weekly sync meetings with clear agendas not random Discord chats, and divide ownership cleanly so you’re not both editing the same files and creating merge conflicts that kill momentum.

The Launch Sequence: From Code Complete to Public Reality

Rocket launch representing project deployment Launch day is sacred—ship it

One week before the planned launch (yes you must have a launch date), implement a strict feature freeze where no new code gets written except for bug fixes that prevent the app from working—this is when discipline matters most. Test your project with three different people who didn’t build it and resist the urge to fix their “user errors” with code changes; instead, improve your documentation or UI text. Write your launch post (yes, you have to become your own marketer) in advance when you’re not stressed, prepare screenshots and a demo video that shows real functionality not mockups, and set up basic analytics using tools like Clarity or Google Analytics so you know if anyone actually uses your project. On launch day, post to a maximum of three relevant communities to avoid being flagged as spam: I use dev.to, LinkedIn, and Twitter. Share on your personal social media without apologizing for imperfections, email your personal network with a brief explanation and clear call-to-action, and post in relevant Discord or Slack communities where you’re already an active member, not a drive-by spammer. The critical post-launch period requires responding to ALL feedback within 24 hours even if just to say thanks, fixing truly critical bugs within 48 - 72 hours but not feature requests, resisting adding new features for at least two weeks to avoid knee-jerk reactions, and collecting all feedback in a “v1.1 Considerations” document for future evaluation rather than immediate action.

The Failure Recovery Plan: Graceful Death Over Slow Decay

Learning from failure and moving forward Kill projects gracefully, learn deliberately

So there are two schools of thought when it comes to recovering from failure, as two types of failure exist: projects that were not completed and missing days of work. Lets start with later. Life happens and thus you may miss a work day or two. My rule of thumb is two never miss three days in a row. If you do, it becomes a new habit and this isn’t the one you are trying to build. You are a builder, a builder of code and momentum, not a janitor of abandoned projects. I use a physical paper planner to track my building sessions and I feel uncomfortable missing more than two days in a row. I have screwed up a project or two in my time, I learnt from them and moved on.

The other type of failure is not completing a project. Not all projects deserve to ship, and having a graceful exit strategy prevents the guilt that compounds with each abandoned project folder on your desktop. Clear criteria for project termination include: after 30 days you’ve worked less than 5 total hours despite having time available, the core problem is now solved better by something released while you were building, you’ve lost genuine interest not just temporary motivation but actual caring about the problem, or technical blockers require learning an entirely new stack that would reset your progress to zero. When killing a project, write a proper post-mortem documenting what you learned technically and about yourself as a builder, archive the repo with a clear README explaining why it’s abandoned so future-you doesn’t wonder, extract any reusable code into your snippet library or a separate utility package, announce the decision publicly if you were building in public to close the loop, and immediately move to your next project without a mourning period. Create a lessons_learned.md file that captures the technical skills gained, project management insights discovered, what you learned about yourself as a builder, what you’d do differently next time, any reusable code patterns worth keeping, and how this experience informs your next build. This documentation transforms failure from shame into education, making each abandoned project a stepping stone rather than a stumbling block.

Your 7-Day Quick-Start Challenge: From Theory to Reality

Starting the journey with action steps 7 days to momentum: start now

So here we are, the action part. Reading about finishing projects won’t finish your projects, so here’s my suggested actionable challenge for the next seven days that will break the cycle of abandonment:

  • Day 1 requires selecting ONE project from your graveyard—not the most ambitious but the one you can realistically complete in 30 days—then spending two hours maximum writing your Kill List, creating your Definition of Done, and setting a hard launch date exactly 30 days from today.
  • Day 2 focuses on setup: configure your development environment with boring, familiar tools, make your first commit even if it’s just a README, decide your complete tech stack using the Boring Tech Principle, and create your basic project structure without over-engineering.
  • Days 3-5 are for building your first MUST-HAVE feature completely with no polish or optimization, just core functionality that works, committing daily even if the code is broken or embarrassing.
  • Days 6-7 establish accountability: make your repository public, write your first “Build in Public” post on any platform, tell three friends about your project and launch date, and schedule your first Sunday 2 PM negotiation checkpoint.

This seven-day sprint creates more momentum than most developers achieve in months of planning, and by day 7, you’ll have broken the paralysis that keeps projects in perpetual planning purgatory.

The Compound Effect: Building a Portfolio, Not Perfection

Portfolio of completed projects growing over time 12 shipped projects beat 1 perfect dream

Think of side projects as a portfolio where volume and completion matter more than individual perfection—you’re building a body of work, note that its not an immediate masterpiece, it takes time to become just that. The portfolio approach I’ve like and am currently adopting maintains three concurrent tracks: one main project receiving 80% of my side project time, one maintenance project that’s already shipped and needs minor updates getting 15% of time, and one idea incubation project for research and planning the next build receiving 5% of time. After launching a project, I rotate the portfolio: the main project moves to maintenance mode, the incubating idea becomes the new main project, and I start researching the next incubation candidate, creating a sustainable pipeline of projects in various stages. The compounding effect becomes powerful over time what has the ability to yield the following minimal results: Year 1 produces 2-3 small shipped projects as you learn the process, Year 2 yields 3-4 projects because you’re faster and more decisive, Year 3 delivers 4-5 projects plus maintaining earlier ones that might gain traction, resulting in 10-12 shipped projects after three years. This portfolio of completed work is infinitely more impressive to employers, clients, and yourself than one “perfect” application that took three years to maybe ship, and each project teaches lessons that make the next one easier to complete.

Conclusion: The Magic of Managed Ambition

The difference between developers who ship and those who don’t isn’t talent, time, or even motivation—it’s the ability to negotiate with themselves, to apply thoughtful violence to their ambitions while celebrating every small victory along the way. Your side projects don’t fail because you’re not good enough or smart enough; they fail because you’re trying to be too good, optimizing for a perfection that doesn’t exist instead of shipping something real that does.

The graveyard of side projects on your github doesn’t represent failure but rather learning, each abandoned folder teaching you something about scope, commitment, or interest that informs better decisions next time. Every unfinished project has served its purpose if it taught you what doesn’t work, what you don’t enjoy, or what complexity really means. But knowledge without application is merely potential energy waiting to be released.

What I’ve learned through shipping process ( abandoned projects, failed projects, successful projects and this article) and 6+ projects in the last few years—many of them embarrassingly simple—is that the world doesn’t need your perfect project. It needs your solved problems, your unique perspective, and your willingness to share imperfect solutions that actually exist. The junior developer who ships consistently will grow faster than the senior developer who polishes perpetually. Your career advances not through perfect projects you plan, but through imperfect projects you complete.

The frameworks in this article aren’t magic. The Kill List won’t write your code. The 48-hour rule won’t generate motivation from thin air. What they will do is give structure to the chaos of creation, boundaries to infinite possibility, and most importantly, permission to ship something less than perfect. Because in the end, your users, your portfolio, and your growth as a developer all care more about what exists than what you imagined.


Your Next Move: The Developer’s Action Plan

Stop reading. Start shipping. Here’s exactly what to do:

Right Now (Next 5 Minutes):

  • Close all browser tabs except this one.
  • Create a new file: KILL_LIST.md in your current project or new folder.
  • Write down THREE features maximum for your MVP.
  • Set a timer for 20 minutes.
  • Start coding the first feature—no setup, no planning, just build.

Today (Within 24 Hours):

  • Choose ONE project from your graveyard—the simplest one, not the coolest.
  • Delete or archive all other unfinished projects to remove temptation.
  • Set your launch date exactly 30 days from today.
  • Tell one person about your project and deadline.
  • Make your first commit, even if it’s just a README.

This Week (Days 1-7):

  • Day 1: Write your Kill List and Definition of Done (2 hours max).
  • Day 2: Set up with boring tech only—no new frameworks.
  • Day 3-5: Build ONE complete feature, no polish allowed.
  • Day 6: Share your progress publicly somewhere (Twitter, Dev.to, Discord).
  • Day 7: Schedule your Sunday 2 PM negotiation checkpoint.

Your 30-Day Shipping Commitment:

Week 1: Foundation

  • Build your 3 MUST-HAVE features.
  • No optimization, no refactoring.
  • Daily commits, broken code is fine.
  • Share one ugly screenshot.

Week 2: Integration

  • Connect your features.
  • Add only critical error handling.
  • Test with yourself only.
  • Integrate accessibility features.
  • Update your README with actual functionality.

Week 3: Polish (Barely)

  • Fix only crash-level bugs.
  • Add minimal UI to make it usable.
  • Write basic documentation and tests
  • Find one brave soul to test it.

Week 4: Ship It

  • Feature freeze on Day 22.
  • Deploy by Day 28.
  • Announce on Day 30.
  • Celebrate regardless of response.

Your Accountability Toolkit:

Pick at least 3 from this list:

  • Tweet your progress with #30DayShipChallenge.
  • Join a community and post weekly updates.
  • Find an accountability partner in a Discord server.
  • Set up a public GitHub repo with your Kill List as the README.
  • Create a daily checkbox in your phone’s reminder app.
  • Promise your rubber duck—but make it public.
  • Start a simple dev log in a PROGRESS.md file.
  • Use a habit tracker app specifically for this project.
  • Block your favorite time-wasting site until you ship.

If You’re a Beginner:

  • Your first project should take 7 days, not 30.
  • Pick something embarrassingly simple (seriously, simpler than that).
  • Success looks like: it works on your computer.
  • Skip authentication, databases, and deployment complexity.
  • A working to-do list beats an imagined SaaS.

If You’re Intermediate:

  • You already know too much—that’s your enemy.
  • Force yourself to use only tech you’ve used before.
  • Success looks like: 10 strangers used it without instructions.
  • Your goal is shipping, not learning (this time or unless its the goal to produce a product that speaks to demostrated competence).
  • Stop building for scale you’ll never reach.

The Non-Negotiable Rules:

  1. No new features after Day 7—only refinement.
  2. No rewrites because you learned a “better way”.
  3. No asking for permission to ship imperfect work.
  4. No waiting for the perfect launch opportunity.
  5. No apologizing for your project’s limitations.

Make This Pledge (Out Loud):

“I will ship something in 30 days. It will be imperfect. It will be useful to at least one person. That person might just be me. That’s enough.”

Final Challenge: Screenshot this action plan right now. Make it your desktop wallpaper for the next 30 days. Every time you see it, either work on your project or forgive yourself for not working—but never forget your commitment to ship.

P.S. - Want accountability? Reply to this article or tweet at me with your Kill List and launch date. Use #KillListFramework and I’ll check in on Day 15 and Day 30. Let’s turn that project graveyard into a project portfolio. Together.


Quick Reference: The Shipping Mantras

  • “Three features, three weeks, then ship”
  • “Done diary daily, scope review Sunday”
  • “If it’s not on the Kill List, it’s not in the code”
  • “48 hours to recover, not to stall”
  • “Boring tech wins; shiny tech delays”
  • “Build in public; shame in private”
  • “Launch imperfect; iterate in public”
  • “Finished beats perfect; shipped beats planned”

Remember: The world needs your imperfect, shipped solution more than it needs your perfect, imagined one. Now close this article and open your editor. Your future self—the one with a shipped project—is waiting.